Skip navigation

Home

Help
The webform component webform_register is not able to be displayed
You do not have permission to view this form.
Project Progress
You are not authorized to access this content.
Overall Completeness Summary
50% complete
Active
Name Delete link Edit link Completenesssort icon
Admin
50% complete
Accounts
50% complete
Sales
50% complete
Store
50% complete
Production
50% complete
Quality
50% complete
Purchase
50% complete
PDF contentPDF content
Overall Completeness Summary
51% complete
Designation Status: Active
Designation Delete link Edit link Completenesssort icon
Chief Accountant
83% complete
Accounts Officer
83% complete
Sales Manager
83% complete
Manager Admin
67% complete
Admin Officer
67% complete
Purchase Officer
67% complete
Sales Officer
33% complete
Store Manager
33% complete
Store Officer
33% complete
Production Manager
33% complete
PDF contentWord Document
Overall Completeness Summary
40% complete
Machine Status: Active
Title Location/Department Interval/Frequency Machine Status Completeness
16 Die Fine Wire Drawing Machine Production Active
40% complete
17 Die Bull Block Production Active
40% complete
21 Die Fine Wire Drawing Machine Production Active
40% complete
21 Die Fine Wire Drawing Machine (Farukawa Japan) Production Active
40% complete
24 Carrier Braiding Machine (1000 meters) Production Active
40% complete
24 Carrier Braiding Machine (2000 meters) Production Active
40% complete
8 Die Medium Wire Drawing Machine Production Active
40% complete
Buncher 400 Din (25,000 meters) Production Active
40% complete
Buncher 530 Din (18,000 meters) Production Active
40% complete
Buncher 530 Din (30,000 meters) Production Active
40% complete
Buncher 630 Din (28,000 meters) Production Active
40% complete
Buncher 800 Din (50,000 meters) Production Active
40% complete
Coiling Machine Production Active
40% complete
F5 Die Fine Wire Drawing Machine Accounts Active
40% complete
P.E. Extruder 65mm Production Active
40% complete
PVC Extruder 100mm Production Active
40% complete
PVC Extruder 65mm Production Active
40% complete
PVC Extruder 75mm Production Active
40% complete
Rubber Extruder 65mm Production Active
40% complete
Standing Machine Production Active
40% complete
Tapping Machine Production Active
40% complete
PDF contentXLSPDF content
Overall Completeness Summary
34% complete
Completeness Completeness Data
Analytical Balance 0.0001mg
75% complete
Biddle
25% complete
Capacitance Meter
25% complete
Digital Electronic Precession Balance AY-220
25% complete
Digital Platform Balance AK-3200H30
25% complete
Digital Platform Balance YH-T3
25% complete
Digital Vernier Caliper
75% complete
Fire Retardant Test Equipment
25% complete
Fuzhou China AK-3200H30
50% complete
H.V. Tester
25% complete
H.V. Tester AC / DC
25% complete
Hi Pot Tester AC
50% complete
Insulation Tester
25% complete
LCR Meter
25% complete
Length Meter
25% complete
Megger B131
25% complete
Megger BM 400 / 2
25% complete
Megger MIT 410 & MIT 515
25% complete
Memmert Germany
50% complete
Micro Meter
25% complete
Micro Ohms Meter
25% complete
Mitutoyo Japan
50% complete
Oven
25% complete
Shadow Master
25% complete
Tensile Tester
25% complete
Thickness Gauge
25% complete
Trafpnel, Pakistan
50% complete
TTI BS-407
50% complete
Yaohua Chine YH-T3
50% complete
You are not authorized to access this content.
Process Edit link Completeness
Enquiry Recieve
75% complete
Prepare Quotation
75% complete
Follow up of Quotation
75% complete
Recieve P.O (PURCHASE ORDER)
75% complete
After Receiving Purchase Order Make the SO Sales Order
75% complete
Check the availability of items
75% complete
ARRANGEMENT / PREPARE OF DELIVERY
75% complete
DELIVER THE ITEMS
75% complete
Purchase the copper
75% complete
purchase the PVC
75% complete
issue the copper for making of wire
75% complete
wire manufacturing process
75% complete
Copper rod
75% complete
Drawing & Annealing
75% complete
PVC
75% complete
PVC Insulation
75% complete
Products
75% complete
Multiple cables step
75% complete
Copper rod
75% complete
Drawing & Annealing
75% complete
PDF content
Documents Completeness Summary
52% complete
Document Name ISO Document Type Completenesssort icon
Work Instructions for Buncher Machine Work Instruction (WI)
83% complete
Work Instructions for Extruder Work Instruction (WI)
83% complete
Buncher machine job Description Job Descriptions (JD)
67% complete
Wire Drawing job description Job Descriptions (JD)
67% complete
Work Instructions for Braiding Machine Work Instruction (WI)
67% complete
Work Instructions for Rod Breakdown Machine Work Instruction (WI)
67% complete
Work Instructions for Stranding machine Work Instruction (WI)
67% complete
Work Instructions for Taping Machine Work Instruction (WI)
67% complete
Work Instructions for Tinning Machine Work Instruction (WI)
67% complete
Quality Manual Manual (MAN)
67% complete
Low Voltage Devices as per relative CE directive 2006/95/EC. System Master File (SMF)
50% complete
Annealing Pot Detail Format/Record (FM)
50% complete
DAILY PRODUCTION REPORT Format/Record (FM)
50% complete
DPR STRANDING MACHINE Format/Record (FM)
50% complete
Extruder Process Inspection Format/Record (FM)
50% complete
Buncher Process Inspection Report Format/Record (FM)
50% complete
Extruder Machine job Description Job Descriptions (JD)
50% complete
Work Instructions for Wire Drawing Machine Work Instruction (WI)
50% complete
Wire Drawing Inspection Format/Record (FM)
50% complete
Laboratory Analysis Report Cooper Format/Record (FM)
50% complete
You are not authorized to access this content.
You are not authorized to access this content.
You are not authorized to access this content.
Recent activity
No recent activity found.
Steps to QMS Certification

QMS Declaration of Conformance CompanyCertification® Scheme Form

DECLARATION BY APPLICANT
 
The Company hereby undertakes
i. To declare that the information in the application and accompanying ISO 9001:2015 Manual and supportive document is true;
ii. To declare that the ISO 9001:2015 programme has been implemented for more than three(3) months and the pre-requisite programmes are in-place;
iii. To comply with the requirement for the ISO 9001:2015 Certification procedure; as defined below
iv. To review regularly the QMS System and maintain its required records online at www.app.companycertification.com or any other suitable media.
 
 
 
Signature : ______________________ Date : ________________
 
 
Name of authorized representative of 
applicant and Company/Premises Stamp :__________________
 
Please return duly completed form to :
Director,
Company Certification Scheme,
 
 
OR
 
Email us the scanned copy at [email protected]
 
Need help?

Watch videon on How to Create an Account?